Well, at least they've FINALLY got started on the new shop.
Time to plan for Rigfest 2006!!
Hopefully the shop will be done within a month or less.
Bret.
Well, at least they've FINALLY got started on the new shop.
Time to plan for Rigfest 2006!!
Hopefully the shop will be done within a month or less.
Bret.
That looks large from the picture, what are the dimensions? How many garage bays?
Lowered with blue h&r(?) springs, Bilsteins, tint, 19# design 3 injectors, Dual Magnaflow
southwest WA
30x40
not sure how many cars will fit, but there will be 2 garage doors on the 40' front side, with a 2 post lift in one of the bays.
I have waited (and saved) for this for a LONG time- I can't wait for them to get it finished!!!
Bret.
Wow, I might have to make a pilgrimage over there once it's done.
How many cars (or cows) did you have to move to plot that sucker out?
best, whit